The five things that set the price
- Finding the leak. Water runs along purlins and sheets before it drips, so the stain on the ceiling is often well away from the hole. Time spent tracing it properly is time saved on repeat visits.
- What failed. A lifted screw or perished washer is cheap. Rusted-through sheet, a failed valley gutter or flashing pulled away from a wall costs more, and the fix has to match what's there.
- What's under the sheet. If water's been getting in for a season, the timber may be soft. Purlins, rafters and fascia that have rotted or been eaten by termites have to be replaced before new sheets go on.
- Access. A low bungalow is quick to get onto. A steep two-storey roof, or one over a neighbour's wall, needs scaffold or more hands.
- Knock-on damage. Stained or sagging ceiling boards, wet insulation and wiring that got wet all add to the bill, but they're separate trades. Ask for them priced separately.

What replacement sheets cost
We don't publish repair labour rates, because they depend on all of the above. Material is easier. Yee Ken Hardware lists 42-inch corrugated Aluzinc at these prices, VAT included, checked 11 November 2026:
| Sheet | Per running foot | Four 12 ft sheets |
|---|---|---|
| 26 gauge Aluzinc | TT$18.00 | TT$864.00 |
| 28 gauge Aluzinc | TT$17.55 | TT$842.40 |
The last column is just the arithmetic for a typical patch of four sheets, materials only. Screws with washers, ridge cap, flashing, sealant and any timber are on top, and you'll want to match the profile of the sheets already on the roof. For a whole-roof job, see galvanize and Aluzinc prices.
Patch, section or whole roof?
| What we find | Usual fix |
|---|---|
| One or two leaks, sheets sound, timber dry | Spot repair: screws, washers, sealant, a sheet or two |
| Rust on one slope or around one valley | Re-sheet that section and replace the flashing or valley |
| Rust through on several slopes, leaks moving around | Price a full re-roof against another round of patches |
| Soft timber, sagging lines, termite tracks | Structural repair first, then sheet |
If you've patched the same roof three wet seasons running, put the money into the full job instead.
When to do it
The Met Service puts the wet season at June to December and the hurricane season at June to November. Book inspections and repairs in the dry months, January to May, when the roof can be opened without a downpour arriving mid-job. After a storm, take photos of the damage before anything is moved; your insurer will want them.
Help with the cost
Roof and ceiling repairs are among the works covered by the Ministry of Housing's Home Improvement Grant, and the NSDP's Minor House Repair Assistance covers materials. Both have income limits. Our grants and loans guide has the details and the links.
What to ask for
- Photos of what was found on top, not just inside
- Sheets, flashing and timber listed separately from labour
- The gauge and profile of any replacement sheet
- What happens if more rot turns up once sheets are off