Do you need it?
The Town and Country Planning Division (TCPD) says planning permission is needed before any development, which includes a new house, a structural addition, a change of use, clearing land and subdividing it. You usually don't need it for:
- Internal changes that don't alter the outside, the floor area or the use, such as a new kitchen or bathroom inside the existing walls
- Changing windows, provided the outside isn't materially changed
- Structures or uses that existed before 1972, unless you change the façade, size or use
An extension, an upstairs, a new apartment downstairs or a garage all count as development. Engineering work such as drains, access roads and clearing land counts too.
The route, in order
- Check the land. Before buying or designing, you can apply for a Status of Land letter. It confirms the permitted use and whether the plot itself is a legal one.
- Decide outline or final. An outline application tells you early whether the idea is likely to pass and what conditions apply, before you pay for full drawings. Final planning permission needs the full set.
- Get the drawings and survey. Site plan, floor plans, elevations, a section, and a survey plan by a licensed land surveyor. Our house plans cost guide covers what those cost.
- Apply on DevelopTT. Since 2020 applications go through the DevelopTT online platform rather than paper, at no cost to the public. The TCPD says there's currently no fee for planning permission.
- Other agencies comment. Depending on the site: the Drainage Division, Highways, the County Medical Officer of Health, the Fire Service, the EMA, T&TEC and WASA.
- Decision. The General Development Order sets a two-month decision period for most applications, which can be extended by written agreement. Plan for it taking longer.
- Building permit. The approval goes to your municipal corporation. You need a provisional building permit from them before work starts, and they set their own permit fee.
- Build to the plans, then the completion certificate. The corporation inspects at the end and issues a Completion Certificate if the work matches the approved plans.

What catches people out
- Changing the house on site. The TCPD is blunt about it: if what you build varies from the approved plans, the permission is nullified and you have to apply again. Extra rooms "while the men are here" are the usual cause.
- Building first, applying later. Unauthorised development can face enforcement within four years. You can apply to retain a building after the fact, but approval isn't guaranteed.
- Hillsides and sensitive sites. Hillside development is one of the categories where an Environmental Impact Assessment or a Certificate of Environmental Clearance from the EMA may be needed.
- Finance. Lenders such as TTMB ask for approved plans before they'll release a construction or home improvement loan.
- Refusals. You can resubmit to address the reasons, or ask for a review by the Minister through the Advisory Town Planning Panel.
Where the offices are
| TCPD regional office | Address |
|---|---|
| North | Eric Williams Finance Building, Independence Square, Port of Spain |
| South | Palms Club, Point-a-Pierre, San Fernando |
| North East | Level 2, Tunapuna Administrative Complex, Eastern Main Road, Tunapuna |
| Tobago | Pump Mill Plaza, corner Plymouth Road and Pump Mill Trace, Scarborough |
Every Wednesday is public day at the regional offices, with pre-application advice. It's worth going before you finalise drawings. In Tobago, divisions of the Tobago House of Assembly handle building permits.
Where we come in
We build from approved drawings, and we'll tell you if what you're asking for on site means going back for an amendment. If you're still at the plans stage, we can help you get drawings that a contractor can price from and an office can approve. More on how the rules work in practice is on our building standards page.