The worked example
A common small bathroom: 5 × 8 ft, walls tiled to 7 ft, with a toilet, basin and shower with hot water. Labour only, using Ahlookin's tiling guide (March 2026) and plumbing guide (January 2026):
| Line | Quantity | Published labour rate | Labour range |
|---|---|---|---|
| Floor tile, porcelain | 40 sq ft | TT$8 – 12 / sq ft | TT$320 – 480 |
| Wall tile to 7 ft, less the door | about 165 sq ft | TT$9 – 12 / sq ft | TT$1,485 – 1,980 |
| Toilet set | 1 | TT$450 – 750 | TT$450 – 750 |
| Basin with drain and supply | 1 | TT$500 – 650 | TT$500 – 650 |
| Shower mixer | 1 | TT$1,200 – 1,900 | TT$1,200 – 1,900 |
| Hot water to basin and shower | 2 fixtures | TT$200 – 300 each | TT$400 – 600 |
| Tankless heater, lines in place | 1 | TT$300 – 650 | TT$300 – 650 |
| Labour subtotal | TT$4,655 – 7,010 |
The wall area is the perimeter (26 ft) times 7 ft, minus a 2½ × 7 ft door. It's arithmetic on published rates, not our quote, and it leaves out the lines below.
What that subtotal doesn't include
- Taking out the old bathroom and carting it away
- Fixing what's behind it: rotten floor, leaking lines, a cracked slab
- Moving the toilet or drain, which means breaking the floor
- Waterproofing the shower floor and walls
- Materials: tiles, thinset, grout, trims, fixtures, heater, glass
- Electrical: heater circuit, extractor fan, lighting
- Ceiling and paint

Buying tile without running short
The tiling guide's rules of thumb: add 10% for a straight lay and 15% for diagonal or patterned work. For the example, about 205 sq ft of tiling becomes about 226 sq ft to buy on a straight lay. A 50 lb bag of thinset covers 30–50 sq ft on a level, prepared surface, so plan five to seven bags, more if the walls are out.
Where the money goes up fast
| Choice | Why it costs more |
|---|---|
| Large-format or patterned tile | Premium labour runs TT$10–15+ per sq ft in the tiling guide |
| Moving fixtures | Breaking and re-pouring floor, new waste runs |
| Walk-in shower, no tray | Falls in the floor and careful waterproofing |
| Niches, benches, feature walls | More cuts, more time |
Keeping it on budget
Keep the toilet and drain where they are if you can. Choose the tile before the price is fixed, since size and pattern change labour. And get the hidden work checked before the tiler starts, because once tile is down, nobody wants to lift it. From our base in Point Fortin we renovate bathrooms across Trinidad, and we price each of these lines separately so you can see where the money's going.
The calculator gives a rough budget range only, not a price. Open the cost calculator hub for the others.
