Replumbing a two-storey house
When an older house has had enough of patched lines, a full replumb is often cheaper over time. Ahlookin's plumbing guide (January 2026) gives labour for an upstairs house at TT$8,000β15,000 and up, and says the complete job, with pipe and fittings, typically runs two to three times the labour. Its usual timeline for an upstairs house is two to three weeks.
What moves a Maraval replumb within that range:
- The number of bathrooms and how far apart they are
- Whether lines run in walls with good tile, stone or wood to protect
- Access to the roof space and under the house
- Hot water to every outlet, which the guide puts at TT$200β300 extra per fixture

Pressure on a slope
A house high on a hillside can have poor pressure at the top floor even when the supply is on. The usual answer is storage, a pump sized for the height, and a pressure tank to keep it steady. On sloping lots, where the tank sits matters: it needs a solid base, and the pump needs a dry, ventilated spot with room to service it. Where supply is on a schedule, WASA publishes temporary supply timetables, and that decides how much storage you need.
Protecting good finishes
We'd rather plan the pipe routes than chase walls blindly. Where we can, new lines run through roof space, ceilings or a service duct, and only the last stretch to each fixture goes into the wall. Before anything is opened, we agree with you which tiles or panels come off and how they'll be made good.
Hot water
Several bathrooms usually means a choice: an instant heater at each bathroom, or a storage heater feeding a hot line through the house. Instant heaters are simpler to add one at a time; a central system needs a planned hot line and a tempering valve. Either way the heater needs its own electrical circuit.
Getting it done
Maraval is a long way from our base in Point Fortin, so we plan replumbs as scheduled jobs, not quick calls. Send photos, the number of bathrooms and what's going wrong, and we'll set out how we'd stage it.