Start with the Trinidad number
There's no official Tobago price list, so the honest starting point is a Trinidad figure plus what the island adds. For Trinidad, SOLD Caribbean's February 2026 ranges are TT$700β1,000 per sq ft for a basic finish and about TT$1,000β1,400 for mid-range, construction only. Ahlookin puts a modest 800β1,000 sq ft two-bedroom starter at about TT$500,000β800,000. See our 2- and 3-bedroom cost guide for how those break down.
One official signal of the gap: the Ministry of Housing's Home Construction Subsidy sets its programme ceiling for a finished house at TT$300,000 in Trinidad and TT$350,000 in Tobago. That isn't a building price, but it shows government planners allowing more for the same house on the island.
What Tobago adds to the bill
Freight across the sea bridge
Nearly everything heavy comes over from Trinidad: cement, steel, blocks, lumber, roofing sheets. It's trucked to the port, shipped, then trucked again. When cargo sailings are cut back, the island runs short. In February 2026 the Trinidad Express reported cement unavailable at several Tobago hardwares, with shortages of sand, steel, lumber and blocks, and 103.1FM quoted the General Contractors Association of Tobago saying construction was near a standstill.
Waiting time
A crew standing around for a delayed truck still gets paid. On a Tobago job, a short delivery can cost more in lost days than the material itself. That's why we order early and keep a buffer of the slow-moving items on site.
Crew travel
If the crew comes over from Trinidad, you're also paying for travel and somewhere to stay. Using local Tobago tradesmen for parts of the job can cut that. We'll talk through which works for your build.
Weather and exposure
The Met Office notes that Tobago's rainfall peaks in November, and that storm systems affect Tobago more directly than Trinidad. Coastal lots also take sea blast, so we specify Aluzinc or coated sheets, stainless or coated fixings and proper concrete cover over steel. Those cost a bit more up front and a lot less later.

A worked 2- and 3-bed budget, with assumptions
Here's how we'd frame a Tobago budget before drawings are priced. The Trinidad lines come from the sources above. The Tobago lines have no reliable published percentage, so we list them instead of inventing one.
| 2-bed starter, ~900 sq ft | 3-bed, ~1,200 sq ft | |
|---|---|---|
| Trinidad baseline | TT$500,000 β 800,000 (Ahlookin) | TT$840,000 β 1.2M basic (SOLD bands Γ 1,200 sq ft) |
| Add: freight and handling | Priced per load once the material list is known | |
| Add: crew travel and lodging | Depends on crew size and job length | |
| Add: delay allowance | Worth carrying while cargo sailings are unreliable | |
| Add: coastal specification | Only if the lot faces sea blast | |
Assumptions: flat or gently sloping approved lot, road access for a truck, simple gable roof, one storey, sensible finishes. Hillside lots in places like Moriah or Charlotteville need retaining and drainage on top.
Approvals on the island
Planning permission still comes from the Town and Country Planning Division, which has a Tobago office at Pump Mill Plaza in Scarborough. The building permit side is handled by Tobago House of Assembly divisions rather than a municipal corporation, and the THA's Electrical Inspectorate issues the certificate T&TEC needs before connecting power. Our approvals guide walks through the steps.
How we'd keep a Tobago build on track
- Fix the drawings and finishes before the first shipment, so nothing is reordered from Trinidad mid-job.
- Ship in planned loads matched to each stage: foundation, blockwork, roof, finishes.
- Store cement dry and off the ground; it doesn't keep well in damp air.
- Agree up front which trades are local and which travel.