📍 Point Fortin, Trinidad & Tobago📞 868-271-4532

Electrical · Port of Spain

Electrical Work and Rewiring in Port of Spain

Older houses in the city were wired for a fridge, a few bulbs and maybe one fan. Add air-conditioning, a water heater and a kitchen full of appliances and the old wiring starts telling you about it. We plan electrical upgrades into renovations and coordinate with licensed electricians where the work requires it.

Request an Estimate Call 868-271-4532

Signs the wiring is past it

Any one of those is worth having looked at. Several together usually means a rewire, not a repair.

When the inspector has to come back

People are surprised how often a renovation triggers an inspection. The Government Electrical Inspectorate lists the usual cases where an Inspection Certificate of Approval is needed, including:

SituationWhat it means for a city house
Changes to the point of supplyUpgrading the supply, replacing the point of entrance or changing the metering
Disconnected more than three monthsA house that stood empty, or was cut off during a long renovation
Disconnection for wiring faultsReconnection only after the faults are fixed and inspected
Insurer asks for itCommon when you insure or re-insure an older property
Standby generator or solarBefore the equipment is used

The licensed wireman and the owner apply together, the wireman must be on site for the inspection, and results are collected from the regional office three working days after.

Empty room with white floor tiles, ready for fitting out

How we stage a rewire

  1. Walk the house, list the circuits and loads you have now and the ones you want.
  2. Agree outlet, switch and light positions room by room before anything is chased into walls.
  3. Do the dirty work, chasing and conduit, with the other trades, so walls are patched and painted once.
  4. Fit-off, testing and the inspection application by the licensed electrician.

If you're living in the house, we work in sections so you keep power to the kitchen and at least one bedroom most days.

City practicalities

Bigger alterations in the city go through the Port of Spain City Corporation for building approval. Parking, deliveries and close neighbours shape the schedule. We're coming up from Point Fortin, so we plan city work as full working days with materials on hand.

Port of Spain electrical questions

Do you rewire houses in Port of Spain?

Rewiring is part of our renovation work. We plan it, do the building side and coordinate with licensed electricians for the wiring and the inspection.

Does a rewire need an inspection?

Where the work changes the point of supply, or the house has been disconnected for more than three months, the Government Electrical Inspectorate needs to inspect before T&TEC reconnects. Ask about your specific case.

Can I stay in the house during a rewire?

Often, yes. We work room by room and keep essential circuits on as much as we can.

Where these figures come from

No prices on this page: electrical work is priced per job inside the estimate for the whole build or renovation. The official pages below back up the inspection and supply steps.

Request an Estimate

Tell us about your project and where it is, and we'll get back to you to talk it through. We work across Trinidad and Tobago.

📞