Start with what the house already has
Before drawing a single new outlet, find out what's feeding the house now. How big is the supply, how many ways are free on the panel, and how old is the wiring it's feeding? An addition that ignores those ends with breakers tripping or a second job pulling the old panel out.
Questions for each kind of addition
| What you're adding | The electrical question |
|---|---|
| Bedroom or two on the back | Spare capacity on the panel, plus a circuit for each new A/C |
| A full upstairs | A sub-panel upstairs, and whether the supply needs upgrading |
| Apartment for rent | Separate metering, which is a point-of-supply change and means an inspection |
| Bigger kitchen | Dedicated circuits for stove, microwave and fridge |
| Water heater | Its own circuit and isolator, planned with the plumbing |

Upgrades mean paperwork
The Government Electrical Inspectorate lists a supply upgrade or a change of metering among the changes to the point of supply that need an Inspection Certificate of Approval before T&TEC reconnects. T&TEC itself advises applying for supply well before you need it and consulting them on where the point of supply should go. On an upstairs addition, that conversation should happen while the drawings are being done, not when the walls are up.
How we fit the electrical into the build
Conduit, boxes and the route for the upstairs feed go in with the blockwork and the slab, so nothing gets chased into finished walls. The licensed electrician wires and fits off at the end and handles the inspection application jointly with you. We coordinate with licensed electricians where the work requires it, and the electrical is priced as its own line in the building estimate.
Approvals
A structural addition needs planning permission and a building permit, and in Arima the permit side is with the Arima Borough Corporation. See our planning approval guide. Arima's a long way from our base in Point Fortin, so we schedule the work in planned blocks with the rest of the job.